When the alarm sounds,
every second counts
Most residential buildings in Argentina lack up-to-date, correctly positioned emergency signage. We design, manufacture and install evacuation and safety signage systems that comply with current regulations — including photoluminescent floor evacuation plans and basic training for building supervisors.
A complete signage service,
from design to installation
We handle every stage of the process so that your building meets regulatory requirements and residents can navigate safely in any emergency.
Technical Design
We assess each floor layout and produce technically accurate signage placement plans. Every sign position is calculated to maximize visibility and comply with IRAM and fire safety standards.
In-House Fabrication
Signs are produced using photoluminescent materials that absorb ambient light and remain visible for hours in total darkness — no power supply required. Durable, weather-resistant substrates for long service life.
Professional Installation
Our team installs all signage at the correct height, angle and location as specified in the technical plan. We document the installation for your building's compliance records.
Per-Floor Evacuation Plans
Printed on photoluminescent material and mounted at each floor's main exit point. Plans show evacuation routes, fire extinguisher locations, emergency contacts and assembly points.
Supervisor Training
A practical briefing for the building's designated supervisor covering how to use the signage system, evacuation procedures, fire extinguisher operation and communication protocols.
Documentation & Compliance
We provide a complete technical dossier including installation records, material specifications and a compliance checklist aligned with Argentine fire safety regulations.
How we work with your building
A structured four-step process that minimises disruption to residents while delivering a complete, compliant signage system.
Initial Assessment
We visit the building, survey each floor, photograph existing conditions and review current signage against applicable regulations.
Technical Plan
We produce a detailed signage layout plan for each floor, specifying sign types, dimensions, mounting positions and materials.
Fabrication
All signs and evacuation plans are fabricated in our workshop using certified photoluminescent materials and durable substrates.
Installation & Handover
Professional installation at every designated point, followed by supervisor training and delivery of the full compliance dossier.
Choose the right service level
Three structured tiers designed for buildings of different sizes and compliance needs.
| Feature | Essential Small buildings up to 4 floors | Standard Buildings 5–12 floors Recommended | Integral Large or complex buildings |
|---|---|---|---|
| On-site technical assessment | |||
| Exit and direction signs | |||
| Fire extinguisher location signs | |||
| Per-floor photoluminescent evacuation plan | |||
| Stairwell and assembly point signage | |||
| Supervisor training session | |||
| Full compliance documentation dossier | |||
| Annual inspection and sign condition review | |||
| Priority replacement service | |||
| Request Info | Get a Quote | Request Info |